01 / DEFINING THE PROBLEM
Rainfall is natural; spatial conditions can amplify flood risk.
It is misleading to reduce floods to “too much rain” or “insufficient infrastructure”. Rainfall characteristics, antecedent soil saturation, surface gradients, river–coast relationships, building density and available outfalls interact differently. The same amount of rain can produce very different effects in neighbouring districts.
Intensity, duration, antecedent moisture and total catchment precipitation.
Impervious areas such as asphalt and roofs, micro-levels and narrow flow corridors.
Network capacity, backflow, basements, ramps and critical entrance elevations.
Cleaning grates, sediment, maintenance access, discharge permits and safe overflow routes.
Approach of this publication: Rather than proposing to rebuild entire structures in dense existing settlements, we compare low-, medium- and high-intervention options that consider constraints such as ownership, implementation cost and buried utility lines.
02 / REFERENCED FINDINGS FROM TÜRKİYE
What do studies in İzmir tell us?
Bornova / Manda River subcatchment
The 2026 study by Yüksel and Coşkun Hepcan, using 0.5 m terrain data and HEC-RAS 2D, modelled the 1,000-year flood discharge scenario. Under the 24-hour rainfall scenario , flood extent was 18% greater and population exposure 13.3% higher than in the 12-hour scenario. These are defined modelling scenarios, not measurements of damage from a single actual event or percentages applicable throughout Türkiye. Source ↗
Mavişehir / Transport network continuity
The January 2026 study by Erdem, Sharifi and Ökmen examines the resilience, accessibility and travel times of transport networks under flood conditions using scenarios and network analysis . This research approach highlights that flood management must account for emergency access routes as well as building plots. Source ↗
Urla / Infrastructure intervention in an existing town
In its announcement of 16 October 2026, İZSU reported that its Urla stormwater infrastructure investment was 90% complete, including 5,131 m of stormwater lines and 1,131 m of reinforced-concrete culverts. These figures are the authority's progress report , not measured performance in specific flood events or evidence that the entire investment was complete. Source ↗
03 / SIX-STAGE DESIGN CHAIN
Design the entire water journey, not merely its disposal.
- CollectIdentify sources of runoff from roofs, roads and paved surfaces.
- Slow downProvide detention, surface retention and level management at suitable locations.
- FilterUse soils, vegetation and pretreatment where necessary.
- StoreDo not confuse flood detention capacity with tanks intended for non-potable reuse.
- ReuseUse water of suitable quality, for example for defined irrigation demands.
- Discharge safelyKeep overflow routes clear to protect people and buildings when system capacity is exceeded.
04 / SCALES OF INTERVENTION
City, villa and estate: the same rain, different design decisions.
Streets and squares
Levels, safe overland flow routes, rain gardens, permeable surfaces, temporary storage and critical transport links are assessed together.
Explore Urban-Scale Solutions ↗Building and garden
Roof runoff, basement and foundation surroundings, retaining-wall backfill, pool/terrace areas, parking ramps and preventing discharge onto neighbouring properties.
Explore Villa Drainage ↗Shared catchment
Flow from several plots, drainage of shared roads, central/distributed tanks, maintenance responsibility and overflow safety.
Explore Estate Systems ↗Subsurface drainage, waterproofing, water pressure behind retaining walls and backflow at ramps require on-site and design review by qualified specialist disciplines.
05 / INTERNATIONAL COMPARISON
Which international solutions could address problems in Türkiye?

A public square can also serve as temporary water retention.
The local authority reports that Benthemplein's three basins can hold approximately 1.7 million litres of rainwater. The transferable lesson for Türkiye is not a fixed volume, but dual-use public space, safe discharge and safety principles.
Explore the Project ↗
A park can become a controlled flow corridor during floods.
According to PUB, the stream flows in a narrower channel during dry weather, while adjacent park areas help convey high flows in stages during heavy rain. Adaptation to Türkiye must consider river regime, flood safety, warnings and available land.
Explore the Project ↗Rotterdam: Cathrotterdam / Wikimedia Commons — CC BY-SA 4.0 · Singapore: Chensiyuan / Wikimedia Commons — CC BY-SA 3.0. The photographs depict real international projects, not work by Peyland.
The UK SuDS design guidelines, Copenhagen's cloudburst plan and Singapore's ABC Waters guidelines broaden the perspective. These documents do not replace Turkish technical regulations. All sources ↗
06 / FRAMEWORK FOR TÜRKİYE
Assess the conditions that make a solution work rather than copying its form.
| Level of intervention | Example measure | Required checks |
|---|---|---|
| Low | Grate and gutter maintenance, improving overland flow, separating roof drainage | Levels, existing connections, maintenance responsibility |
| Medium | Rain gardens, tree-pit biofiltration and suitable permeable paving | Groundwater/soil, loading, pollution and utilities |
| High | Distributed detention, larger tanks, overland floodways and connection upgrades | Hydraulic analysis, ownership, investment cost and operation |
How should the work proceed?
- Understand the site: Catchment and microtopography, rainfall, soils, critical building entrances and existing lines.
- Prioritise risks: Human safety, critical transport, buildings and planting areas.
- Compare options: Space, maintenance, investment and safe overflow constraints.
- Complete specialist design: Hydraulic, geotechnical, waterproofing, building-services and permit checks.
- Operate and monitor: Ponding duration, tank levels, blockages, maintenance and performance in use.
To develop the research into original field studies in future, defined pilot sites would need systematic measurement of rainfall, inflow/outflow, maximum ponding depth, drawdown time, maintenance frequency and costs.
07 / PUBLICATION LIMITATIONS AND SOURCES
It is as important to state what we have not measured as to cite sources.
This is not a forensic, meteorological or hydraulic report attributing causes to any specific flood event in Türkiye. It is not presented as measured performance from a built project, a proposal on behalf of local authorities, or a verified building-safety report. Conceptual diagrams cannot be used to derive construction dimensions or pipe sizes.
- Yüksel and Coşkun Hepcan (2026), rainfall duration and flood exposure in the Bornova catchment.
- Erdem, Sharifi, Ökmen (2026), transport-network resilience under Mavişehir flood scenarios.
- İZSU (16 October 2026), Urla stormwater infrastructure works.
- City of Rotterdam, Benthemplein and temporary rainwater storage areas.
- PUB, naturalised water corridor at Bishan–Ang Mo Kio Park.
- Defra (2025), UK sustainable drainage design standards.
- CIRIA, SuDS Manual C753.