Following the path of water

The path rainwater takes is part of urban design. Solutions begin by considering streets, green spaces and infrastructure as one connected flow system.

Opportunities for intervention in existing urban fabric are limited. Pavement widths, tree roots, underground services and accessibility must be assessed together. The starting point is not choosing a new product, but identifying where water comes from, where it collects and where it will go when capacity is exceeded.

  1. Map the runoff area. Map roofs, roads and paved surfaces together with microtopography.
  2. Identify critical points. Examine basement entrances, underpasses, pedestrian crossings and emergency access routes together.
  3. Verify the ground and connections. Assess permeability, groundwater, existing infrastructure and controlled discharge options.
Technical illustration · Conceptual

How water moves along a street

  1. The street plan and section A–A explain the levels of the same planted area.
  2. A kerb opening and stone protection regulate the water inlet.
  3. Overflow routes and maintenance access are planned alongside continuous pedestrian movement.
Peyland · Not-to-scale explanatory drawing. Continuous pedestrian access is retained. Arrows show example runoff directions; this is not a survey of an existing street.

Complementary solutions

Vegetated swales slow and filter runoff; bioretention areas help retain water temporarily. Permeable paving allows water to pass through the surface into underlying layers, where it may infiltrate or be removed by underdrains depending on ground and design conditions. ↗

MeasureWhere to consider itKey design checks
Rain gardenGreen pockets and square edgesInlet, overflow, filter media and maintenance access
Vegetated swaleRoadsides and parking edgesLongitudinal gradient, flow velocity and pedestrian crossing
Permeable pavingParking lots and walkwaysLoad-bearing capacity, sub-base and clogging risk
Water-retaining public spaceSquares and parks with suitable levelsUser safety, drainage and cleaning
Technical illustration · Conceptual

How does permeable paving work?

  1. Six components are shown separately in an open-jointed concrete paver example.
  2. Load-bearing and storage layers perform different functions.
  3. Infiltration and underdrain options depend on site investigations.
Peyland · Not-to-scale explanatory drawing. Infiltration and underdrains depend on site conditions; neither is universally mandatory.

The system beneath the visible greenery

A rain garden is more than a planted depression. Inlets, growing media, drainage and overflow outlets for extreme events must be designed together. PUB guidelines treat design, construction and maintenance as one technical process. ↗

Technical illustration · Conceptual

Layers of a rain garden

  1. Runoff and sediment are managed together at the inlet.
  2. Filter and transition layers lie beneath the planted surface.
  3. Underdrains and high-level overflow perform different functions.
Peyland · Not-to-scale explanatory drawing. Conceptual bioretention section, not a dimensioned construction drawing.

Plants are selected for temporary wetness and dry periods. Water ponding depth and drawdown time are calculated for each project.

Planting structure and roadside relationship in a rain garden. General example, not a particular Peyland project.
Rogersoh / Wikimedia Commons · CC BY-SA 3.0 · May be cropped for display.

Design for maintenance as well

Leaves and sediment may obstruct inlets. A filter that maintenance crews cannot access or an inspection point that cannot be cleaned weakens system reliability. Cleaning points and responsibilities must be shown clearly in the design.

What should be documented after rainfall?

Record the location of ponding, the highest water level, drawdown time and overflow path with photographs. Compare outcomes against the project's objectives.

What if the existing infrastructure is insufficient?

Runoff reduction, temporary retention and safe overland flow routes are considered together. Each solution's discharge conditions and impacts on neighbouring sites must also be checked.

Sources and Reading Notes

This technical account draws on the sources below and Peyland's research draft dated 31 October 2026. Statements labelled “Peyland assessment” are editorial interpretations. International guidance is not presented as binding standards for Türkiye.

  1. US EPA · Types of Green Infrastructure ↗
  2. PUB · ABC Waters Design Guidelines ↗
  3. HHSK · Waterplein Benthemplein ↗
  4. Peyland · In-depth research draft dated 31 October 2026 ↗
Full Image Credits ↗