01 / Rotterdam · Benthemplein
Studying good examples requires understanding how they work before copying their forms.
Cathrotterdam / Wikimedia Commons · CC BY-SA 4.0 · May be cropped for display.
Two use scenarios for a water square
- In dry weather, the area serves public activities.
- During rainfall, suitable basins can temporarily store water.
- Emptying and cleaning determine when the area can be reused.
Benthemplein combines public space and rainwater storage in one design. Water collected from the surroundings follows visible routes into the basins, making water management a legible part of the square. The regional water authority describes the project as a multifunctional space integrating water, sport and greenery. ↗
| Project Review | Design Implication |
|---|---|
| Problem | Providing space for rainwater in a dense urban environment |
| Approach | Combining public use with temporary water retention |
| Control point | Filling and emptying cycles, user safety and cleaning after rainfall |
02 / Singapore · Bishan–Ang Mo Kio
Pagodashophouse / Wikimedia Commons · CC BY-SA 3.0 · May be cropped for display.
Designing river and park together
- Before: flow is contained within a clearly defined channel geometry.
- After: the river and adjacent park corridor are considered together.
- As water levels change, floodplain and safe access become important.
The concrete canal was transformed into a naturalised river corridor integrated with the park through a collaboration between PUB and NParks. The project demonstrates that river and public open space can be planned together. Soil bioengineering techniques were also applied to bank design. ↗
The lesson is not to transform every watercourse in the same way. Flow regime, floodplain, bank dynamics and user access are site-specific. Operations and monitoring are as important as the appearance of the landscape.
Transfer the design principle, not the example
| Comparison | Benthemplein | Bishan–Ang Mo Kio |
|---|---|---|
| Main space | Urban square | River and park corridor |
| Core approach | Temporary storage and multifunctionality | Naturalisation and park integration |
| Key assessment | Levels, outfall, cleaning and safety | Flow, banks, ecology and access |
These examples at different scales make the same question visible: how much space do we allocate to water, when and in what way? Rainfall data, soil, ownership, infrastructure and maintenance capacity must be reassessed for each local project.
The photographs show real projects. We do not claim that Peyland designed or built them or measured their performance.
Sources and Reading Notes
This technical account draws on the sources below and Peyland's research draft dated 31 October 2026. Statements labelled “Peyland assessment” are editorial interpretations. International guidance is not presented as binding standards for Türkiye.